Knowing what a properly executed automated system installation looks like helps any buyer evaluate installation companies before signing a contract. A complete installation process includes the following phases.
Site survey and building verification. Before any system is specified, the building must be measured and verified: clear height confirmed, column spacing documented, floor load assessed, sprinkler placement mapped, and dock and utility locations noted. A system specified without this step will produce surprises during installation.
Layout and system design. Based on the site survey, the system layout is designed to optimize the relationship between the automation and the existing facility structure, pick workflow, and WMS integration requirements. The layout should exist on paper before any equipment is ordered.
Permitting. Depending on the municipality and the scope of the installation, permits may be required. Permit timelines vary from a few days in some jurisdictions to several weeks in others. This timeline must be built into the project schedule before it is presented to the buyer.
Installation sequence. Rack and structural components are staged, installed, and verified before mechanical and electrical systems are integrated. Starting software commissioning before mechanical installation is complete adds unnecessary complexity and delay.
Software commissioning. The control system is configured, tested, and integrated with the WMS. This phase is frequently underestimated in timeline. Commissioning a system to production performance standards takes time that belongs in the project schedule, not after it ends.
Operator training and performance verification. The system is not complete until operators are trained on the interface and the system has been verified to perform at the throughput and accuracy specifications it was designed for.